To the central content area

109 Miaoli County Mingde Reservoir Total Phosphorus Total Phosphorus Control and Total Reduction Plan

Absrtact
The Environmental Protection Bureau of Miaoli County Government (hereinafter referred to as your bureau), in order to cooperate with the Environmental Protection Agency to promote the total pollution control policy, implemented the "Miaoli County Mingde Reservoir Total Phosphorus Total Phosphorus Total Phosphorus Control and Total Reduction Plan" (hereinafter referred to as this plan) in 109. Drawing), according to the spirit of the Water Pollution Law, the Mingde Reservoir’s total volume control and total volume reduction strategy are planned. It is hoped that through this project, the environmental background data survey can be used to understand the impact of point source and non-point source pollution on the optimal trophic pollution of the reservoir. Established reservoir optimization simulation and water quality optimization improvement plan formulation, handled high-pollution business reduction meetings, and formulated pollution control plans and handled follow-up public explanation meetings to improve the water quality of Mingde Reservoir and reduce the optimization situation Target.
Keyword
Cap, Reservoir
Open
top